A pool route doesn't divide evenly into hours the way a lot of other field service does. One stop might take eight minutes, the next twenty-five if there's a filter to backwash or an algae problem to treat. Most owners pay per pool serviced instead of per hour, then choose between two ways to set that per-pool rate.
The two structures
Flat rate per pool pays the same amount for every pool serviced that period, regardless of how many the tech does. It's simple and fully predictable on both sides.
Tiered by route volume raises the per-pool rate once a tech's total pools serviced in the pay period crosses a threshold, rewarding whoever covers more of the route, picks up overflow stops, or takes on extra volume in a busy week.
Example rates and results
| Pools serviced in the week | Rate per pool |
|---|---|
| 1–20 | $12.00 |
| 21–35 | $14.00 |
| 36 or more | $16.00 |
| Tech | Pools | Tiered pay | Flat pay ($14.00 per pool) | Difference |
|---|---|---|---|---|
| Tech A | 15 | 15 × $12.00 = $180.00 | 15 × $14.00 = $210.00 | Flat pays $30.00 more |
| Tech B | 38 | 38 × $16.00 = $608.00 | 38 × $14.00 = $532.00 | Tiered pays $76.00 more |
Tech A, 15 pools this week:
Tiered: 15 falls in the 1–20 band → 15 × $12.00 = $180.00
Flat: 15 × $14.00 = $210.00
Flat pays $30.00 more for the lower-volume week.
Tech B, 38 pools this week:
Tiered: 38 falls in the 36+ band → 38 × $16.00 = $608.00
Flat: 38 × $14.00 = $532.00
Tiered pays $76.00 more for the higher-volume week.
When each one fits better
- Route sizes are fairly consistent week to week: flat rate's simplicity has little real downside, since there's not much volume variation for a tiered rate to reward.
- Volume genuinely swings: seasonal demand, a tech covering someone else's stops, callout jobs layered onto a regular route. Tiered rewards the tech actually carrying that extra load, where flat rate would pay them the same as a quiet week.
This guide is the math. In the sheet, the tiered rate is settled on the payout summary once the period's stop count is known, so nobody is paid a mid-period tier by mistake. The $49 sheet does it every pay period: set each person's rule once, log the jobs, pick the pay dates, and the payout summary totals itself.
See the $49 payout spreadsheetTiers apply to the whole period, not just the jobs after the threshold
Once a tech's pool count for the pay period crosses a tier threshold, the higher rate applies to every pool serviced that period, not only the ones serviced after the threshold was crossed. This is the same convention used for tiered commission elsewhere on this site: the rate depends on the period's total volume, so it can only be finalized once the period is over, not job by job as the count climbs.
- Doing this by hand for one period: the free calculator handles the percentage + full-tip-passthrough case; for tiered-by-volume specifically, the payout spreadsheet below has it built in.
- Running this every pay period: the payout spreadsheet calculates the correct tier automatically from each tech's total job count in the filtered date range.
- Would rather not touch the data entry: send us your route data and pay rules, and get a payroll-ready file back within 24 hours, whichever structure you use.
Common questions
Should I pay pool techs a flat rate or a tiered rate by route volume?
Flat rate is simpler and more predictable when route sizes stay fairly consistent week to week. Tiered by volume rewards a tech who covers more of the route or picks up overflow stops, which matters more when weekly pool counts genuinely vary: seasonal demand, callouts, or a tech covering for someone out that week.
How does a tiered pool-service rate actually apply: per pool, or to the whole period?
Once a tech's total pools serviced in the pay period crosses a threshold, the higher rate applies to every pool in that period, not just the ones after the threshold was crossed. Applying it only to jobs past the threshold creates confusing per-job disputes about which rate a given pool was actually paid at.
Does a cancelled or rained-out stop count toward the volume tier?
That's a policy decision, not a math one, but it needs to be made explicit and applied consistently. Some owners count a scheduled-but-cancelled stop toward the tier since the tech held the time slot for it; others don't. Whichever is chosen, it should be the same rule every period, not decided stop by stop.
If your current spreadsheet doesn't have built-in checks for a missing date, a missing name or a technician who isn't on the roster, that's the gap to close first. It's the difference between you catching a missing tech and the tech catching it. The $49 sheet ships with them built in and a red "Check" column on the job log that names the problem row.
See what's in the $49 sheet