Most of the actual "is everyone getting paid right" question happens at one screen, the payout summary, not the log of individual jobs underneath it. Knowing what each column is supposed to show, and which few things are worth double-checking before you send money out, is most of what separates a boring payday from a dispute.

What each column actually means

A payout summary row is one technician, for whatever date range you've set. Here's what's in it, left to right:

  • Technician / Pay rule: who, and which of the four pay structures they're on for this period. See how each of the four is calculated if any of them look unfamiliar.
  • Rate used: the rate actually applied, not necessarily their listed default. This matters most for tiered technicians, whose rate depends on how many jobs they completed in the period itself, not a fixed number set on the roster.
  • Jobs / Revenue: how many jobs, and how much they billed in total, before commission or tips. This is what "Rate used" gets applied against.
  • Commission: what the rate and revenue produce, calculated for you.
  • Tips (own) / Tip pool share: kept separate on purpose. "Tips (own)" is whatever a technician kept from their own jobs; "Tip pool share" is whatever they're owed from a shared pot. Same technician can have both in the same period.
  • Total payout: commission plus both tip columns. The number that actually goes on the check.
Worked example
J. Rivera, percentage pay rule, rate used 40%.
5 jobs · $1,100.00 revenue · $440.00 commission.
$85.00 kept from own jobs, $12.50 owed from the shared tip pool.
$440.00 + $85.00 + $12.50 = $537.50 total payout

The company totals underneath

Below every technician's row, four totals add the whole period up: total job revenue, total commission paid, total tips paid out, and total payouts, which is what you actually owe the crew. They're the fastest way to sanity-check the period before you send anything out: if total commission paid looks wildly different from a normal period with a similar job count, that's worth a second look before payday, not after.

The date range at the top

The From and To dates are the pay period, not a filter on the report. Change either one and every number below updates to match. Leave both blank and you'll see every job ever logged, totaled together, which is almost never what you actually want at payday.

Common mistake Everything reads $0.00 and it looks like the sheet is broken. Nearly always it's the date range. A From date later than your logged jobs matches nothing, and an empty range totals to zero rather than throwing an error. Check the dates first, before anything else.
Want this exact screen?

The summary described on this page is the Payout Summary tab of the $49 sheet: one row per technician, rate used, jobs, revenue, commission, own tips, pool share, total. It's driven by the From/To dates at the top, with the company totals and the self-checks underneath. Log jobs on one tab, read payouts on the other.

See the $49 payout spreadsheet

The four self-checks and what they catch

The dangerous spreadsheet error is never the one that throws an error message. It's the silent one: a technician missing from a payout run, with both sides only noticing once the paycheck already looks wrong. A payout summary worth trusting checks for exactly four things:

  • A job missing a date: excluded from every total until it's fixed, so it can't land in the wrong period or no period at all.
  • A job missing a technician: nobody gets paid for it, and nothing else on the summary would otherwise tell you it happened.
  • A job for someone not on the roster: usually a name typed by hand instead of picked from a dropdown, or a technician removed from setup after the fact. Their work is invisible to every total until they're added back.
  • Unallocated rounding: leftover cents from splitting a tip pool that haven't been assigned to anyone yet.

Each of these fails silently by default. The total simply comes out slightly, or significantly, wrong, with nothing flagging why. The point of checking for them explicitly is that a technician never has to be the one who notices their check is short.

Common questions

What does "Rate used" mean on a payout summary?

The actual rate applied to that technician for the period, not their default rate. For most pay structures the two are the same, but a tiered technician's rate depends on how many jobs they completed in the period, so "Rate used" is what actually got applied, which can differ from what they'd expect from a slower or busier period.

Why does everything on the payout summary show $0.00?

Almost always the From/To date range at the top. If the From date is later than your logged jobs, or the range simply doesn't overlap the period you're trying to pay, every total reads zero even though the underlying job data is fine. Check the date range before assuming anything is actually broken.

What do the self-checks on a payout summary actually catch?

Four specific silent errors: a job missing a date, a job missing a technician, a job logged for someone who isn't on the roster (usually a typed name instead of a dropdown pick), and unallocated rounding left over from splitting a tip pool. Each one would otherwise leave a technician underpaid without either side noticing until it's already a dispute.

Before next payday

If your current spreadsheet doesn't have the four checks above, that's the gap to close first. It's the difference between you catching a missing tech and the tech catching it. The $49 sheet ships with them built in and a red "Check" column on the job log that names the problem row.