‹ Back to the free calculator

Multi-inspector home inspection firms most commonly pay each inspector a percentage of what the client pays for the base inspection, plus separate commission on add-on services (radon testing, termite/WDO inspection, sewer scope, pool or spa inspection) that are often sold and performed at the same visit.

The base commission

A commonly cited range among multi-inspector firms is roughly 45-50% of the base inspection fee paid to the inspector who performed it, with the firm supplying the client relationship, scheduling, and often a vehicle or equipment in exchange for the remainder. There's no single universal number, since it varies by firm, but this is the range that comes up repeatedly when inspectors compare notes on multi-firm pay.

Worked example
Base inspection fee: $450.00 · commission rate: 45%.
$450.00 × 45% = $202.50

Add-on services carry their own rate

Add-ons are frequently commissioned separately from the base report, since they take extra time and often extra equipment. A radon test needs a monitor left on-site and picked up later; a sewer scope needs a camera and a different skill set. Paying the same percentage on an add-on as on the base report can over- or under-pay relative to what the business actually intended for that service.

Worked example, continued
Same appointment. Radon test add-on: $150.00 at 50% commission.
$150.00 × 50% = $75.00.
Base ($202.50) + add-on ($75.00) = $277.50 total for the visit.
Common mistake Applying the base inspection's commission rate to every add-on automatically, instead of the rate actually agreed for that specific service. Add-ons often carry thinner margins once equipment cost and extra time are accounted for. A flat "same percentage for everything" approach can pay out differently than the business intended.
Doing this every pay period?

This guide is the math. In the sheet, an add-on goes on its own row with a one-job rate override, so the base inspection keeps the inspector's normal rate. The $49 sheet does it every pay period: set each person's rule once, log the jobs, pick the pay dates, and the payout summary totals itself.

See the $49 payout spreadsheet

When different inspectors handle different parts

On some appointments, one inspector performs the base report and a different inspector (or a specialist) performs an add-on like a sewer scope. When that happens, each inspector should be paid commission only on the portion they actually performed: the base commission goes to whoever did the report and the add-on commission to whoever did that specific service, not split between them.

  • Doing this by hand for one period: the free calculator handles the percentage + full-tip-passthrough case for a single service.
  • Running this every pay period: the payout spreadsheet supports a per-technician commission rate, so a base rate and an add-on rate can be tracked as separate line items.
  • Would rather not touch the data entry: send us your appointment data, base inspections and add-ons both, and get a payroll-ready file back within 24 hours.

Common questions

What percentage of the inspection fee do multi-inspector firms typically pay?

There's no single universal number, but a commonly cited range among multi-inspector firms is roughly 45-50% of the base inspection fee, with the firm supplying the client relationship, scheduling, and often a vehicle or equipment in exchange for the remainder.

Do add-on services like radon or sewer scope get the same commission rate as the base inspection?

Not always. Add-ons are frequently commissioned at their own rate, since they carry different time and equipment costs than the base report. Applying the base rate to every add-on automatically can pay out more or less than the business actually intended.

Can one inspector do the base report and a different inspector do an add-on at the same appointment?

Yes, and when that happens each inspector should be paid commission only on the portion they actually performed: the base commission goes to whoever did the report, the add-on commission to whoever did that specific service.

Before next payday

If your current spreadsheet doesn't have built-in checks for a missing date, a missing name or a technician who isn't on the roster, that's the gap to close first. It's the difference between you catching a missing tech and the tech catching it. The $49 sheet ships with them built in and a red "Check" column on the job log that names the problem row.

See what's in the $49 sheet